PX02 Smart Ring Fitness Tracker for Men Women Fitness Ring Pedometer Heart Rate Blood Oxygen Sleep Monitor Activity Trackers for Sports Time, Distance, Calories Compatible with Android iOS

PX02 Smart Ring Fitness Tracker for Men Women Fitness Ring Pedometer Heart Rate Blood Oxygen Sleep Monitor Activity Trackers for Sports Time, Distance, Calories Compatible with Android iOS

$ 49.99

$ 0.00

Save: $

Color:
  • Black
  • Gold
  • Silver
Ringsize:
  • 8182mm
  • 9190mm
  • 10199mm
  • 11207mm
  • 12215mm
  • 7174mm
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

  • Super Light:
  • The smart ring weighs only 4.5 grams, and its lightweight design brings multiple advantages, especially noticeable during exercise. The lightweight design means it won't restrict hand movement, even during intense exercise, reducing the risk of injury by avoiding extra pressure or burden on the hands. More importantly, it doesn't interfere with activity execution, maintaining good performance during exercise.
  • Health Monitor:
  • This smart ring uses optical sensor technology to monitor heart rate and blood oxygen saturation, providing intuitive data support for your health. When night falls, the built-in gravity sensor in the ring estimates your sleep time based on your movement frequency and provides feedback on sleep quality as a reference.
  • Comprehensive Sports Tracking:
  • This smart ring accurately records your activity data throughout the day. The ring calculates your steps, distance traveled, calories burned, and heart rate fluctuations during exercise. Additionally, the smart ring provides many different sports modes, including but not limited to walking, running, cycling, and various indoor and outdoor activities.
  • Powerful App:
  • By downloading the corresponding application on your smartphone, the ring synchronizes the monitored data to your phone, allowing you to view the collected data at any time. Whether you're an Android or iOS user, this application can perfectly adapt to your system, providing detailed charts to help you monitor your activity progress and health status.
  • Beautiful and Practical:
  • The material of stainless steel has a metallic luster and a modern feel, making it aesthetically pleasing. Furthermore, it is highly durable, resistant to rust and discoloration. The surface does not attract dust or leave dirt residue, maintaining its shine even with prolonged wear. Its ease of cleaning and maintenance eliminates much of the hassle of upkeep.
  • Smart ring for men and women features heart rate monitoring, blood oxygen monitoring, sleep monitoring, step counting, mileage, and calorie consumption measurement. The smart ring is easy to wear and can be used effortlessly during outdoor sports, travel, or daily activities to monitor health or utilize other functions at any time. This makes it particularly suitable for sports enthusiasts and individuals who frequently perform hand movements.

 

You May Also Like

Galaxy S21 Series - Slim Armor
Galaxy S21 Series - Slim Armor

$ 39.99

Cambo MBX-2 Black Studio Camera Stand Column - 9' (2.7m)
Cambo MBX-2 Black Studio Camera Stand Column - 9' (2.7m)

$ 45.95

$ 59.74

Yottamaster Hypercube 4 in 1 USBC SD TF CF MS Memory Card Reader
Yottamaster Hypercube 4 in 1 USBC SD TF CF MS Memory Card Reader

$ 19.99

$ 29.99

ULCS AC-CSF-28
ULCS AC-CSF-28

$ 37.95

HD 1080P Wireless Solar Backup Camera Kit: Portable Magnetic Rear View for Trucks, RVs, and Campers
HD 1080P Wireless Solar Backup Camera Kit: Portable Magnetic Rear View for Trucks, RVs, and Campers

$ 51.14

$ 66.48

NOS Adjustable Pressure Switch - 15 PSI Adjustable Pressure
NOS Adjustable Pressure Switch - 15 PSI Adjustable Pressure

$ 38.52

$ 87.34

Fotodiox Pro Lens Mount Shift Adapter - Rollei 35 (SL35) SLR Lens to Fujifilm Fuji X-Series Mirrorless Camera Body
Fotodiox Pro Lens Mount Shift Adapter - Rollei 35 (SL35) SLR Lens to Fujifilm Fuji X-Series Mirrorless Camera Body

$ 54.64

$ 71.03

Batteries N Accessories BNA-WB-CPP-531 Wireless Headset Battery - Li-Pol, 3.7V, 170 mAh, Ultra High Capacity Battery - Replacement for Sennheiser BW900 Battery
Batteries N Accessories BNA-WB-CPP-531 Wireless Headset Battery - Li-Pol, 3.7V, 170 mAh, Ultra High Capacity Battery - Replacement for Sennheiser BW900 Battery

$ 17.95

CASEMATIX Travel Case Compatible with Konami TurboGrafx-16 Mini Hardware and Controller, PC Engine CoreGrafx Mini Hard Shell Carrying Case with Foam
CASEMATIX Travel Case Compatible with Konami TurboGrafx-16 Mini Hardware and Controller, PC Engine CoreGrafx Mini Hard Shell Carrying Case with Foam

$ 38.99

Box One Carbon 1-1/8 Inch Integrated Headset
Box One Carbon 1-1/8 Inch Integrated Headset

$ 99.99

Cart
Evolving the Way You Experience Virtual Reality
Your cart is currently empty.